Space for family
Consider privacy, ease of entry, bathroom access and how separate living connects with the main home. Accessibility needs should be discussed with qualified project professionals.

ADU homes
An accessory dwelling unit begins with a simple question: how should this space support daily life?

Think in daily routines
Consider privacy, ease of entry, bathroom access and how separate living connects with the main home. Accessibility needs should be discussed with qualified project professionals.
Think about storage, cooking needs and the level of independence a visit requires. A comfortable sitting area can matter as much as another room.
Work space and residential use can have different requirements. Confirm the intended occupancy and the approvals that apply before treating a structure as a dwelling.
A space relationship study
Living and cooking connect; a quieter rest area separates; washing and services need their own planning. This sketch is a prompt for a discussion, not a product drawing.
No dimensions, occupancy approval or buildability are implied. Request actual specifications and professional drawings for a selected unit.
Ask for the actual model, dimensions, included components, foundation requirements and available technical drawings. Check what is supplied separately and what requires work on site.
Confirm access, unloading, utility connections and the parties responsible for each part. Sales, delivery, installation and construction services should never be assumed to be one package.
Local land-use and building requirements vary. Verify approvals with the relevant authority and obtain a written scope, payment schedule, delivery terms and warranty information before committing.
A home, part by part
Ask what the structure, exterior envelope, roof and openings include. Confirm which drawings and product documents describe the selected home rather than a general concept.
Identify partitions, fixtures, finishes, storage and any kitchen or bathroom components. Record whether appliances, fittings or furniture shown in an image are included.
Clarify the interfaces for water, electricity, wastewater and ventilation. Site utilities and connection work need an assigned scope and a qualified delivery team.
Use a room-by-room list to record priorities and acceptable alternatives. This makes a comparison useful even before a final model or configuration has been selected.
Connect the specification to daily use